| Client | DIRECTORATE GENERAL OF TURKISH RAILWAYS – DEPARTMENT OF RAILWAYS CONSTRUCTION | |
| Total Volume of Excavation | 48.942.873,00 m³ | |
| Total Volume of Fill | 16.511.140,00 m³ | |
| Number of Tunnels | 10 EA | |
| Total Length of Tunnel | 8.752,00 m | |
| Total Length of Railway Line | 161,80 km | |
| Number of Cut-and-Cover Tunnels | 2 EA | |
| Total Length of Cut-and-Cover Tunnel | 460 m | |
| Number of Viaducts | 17 EA | |
| Total Length of Viaduct | 6.432,45 m | |
| Number of Underpasses | 74 EA | |
| Number of Overpasses | 31 EA | |
| Number of Culverts | 187 EA | |
| Number of Bridges | 24 EA |